From the ground up
Photographs from the site in the order the building went up — foundation first, current stage last. Every image is a photograph taken on site; nothing here is a render.
Last updated October 2026. Updated as each stage completes.
Phase 1
Foundation and raft
Column reinforcement cages standing on the cast raft. Excavation, footing and the raft pour came before this — the stage every floor above depends on.
Phase 2
Basement: retaining walls and columns
Retaining walls up, column cages in, the first shuttering on. The neighbouring buildings in the frame give the scale of the dig.
Phase 3
Slab steel and the first pours
Reinforcement laid across the full footprint and checked before the concrete goes in — the stage buyers rarely get to see.
Phase 4
Basement complete, ground floor slab
The basement — the parking level — cast and clear, with its columns and beams in place. Above it, the ground floor slab shuttered and ready.
Phase 5
Two floors up, masonry begins
Ground and first floor slabs cast, columns for the next floor rising, and block masonry under way on the lower levels — the building now reads as a building from the road.
Phase 6 · current
Second floor slab — current stage
Steel laid for the second floor slab, then the pour. Slabs are now cast up to the second floor, the columns for the next floor are up with shuttering on, and masonry is well advanced below.
How this relates to what you pay
The payment plan is construction-linked: each instalment falls due only after the stage it names — basement slab, plinth, each floor slab — has actually been built. The photographs on this page are the visible record of those stages going up.
Stage completion dates for payment purposes are certified by the project engineer and shared with every buyer with the demand notice. This page is a record of progress, not the demand notice.
See the site for yourself
Thirty minutes, no sales pressure. Walk the site, see the stage it is at, and decide at your own pace. Open every day, 10am to 7pm.
Book a Free Site Visit →Common questions
What stage is construction at?
At the latest update (October 2026), slabs are cast up to the second floor and the columns for the next floor are rising, with block masonry under way on the lower floors. The photographs on this page show each stage in order.
How often is this page updated?
As each stage completes, with photographs taken on site. The current stage is always the last section.
Can I see the construction in person?
Yes. Site visits run every day from 10am to 7pm, and the sales team will walk you through the site. Book a visit and you can see the current stage for yourself.
Vasantara Skies