Construction Updates

Photographs from the site, stage by stage, from the foundation to where it stands today. See what has been built before you pay for it.

Vasantara Skies under construction — three slabs cast, columns rising, site hoarding on the road in Chhani, Vadodara
The site today. Real photographs, not renders.

From the ground up

Photographs from the site in the order the building went up — foundation first, current stage last. Every image is a photograph taken on site; nothing here is a render.

Last updated October 2026. Updated as each stage completes.

Phase 1

Foundation and raft

Column reinforcement cages standing on the cast raft. Excavation, footing and the raft pour came before this — the stage every floor above depends on.

Column reinforcement cages standing on the cast basement raft at Vasantara Skies, Chhani
Column cages on the raft.

Phase 2

Basement: retaining walls and columns

Retaining walls up, column cages in, the first shuttering on. The neighbouring buildings in the frame give the scale of the dig.

Basement retaining walls and column reinforcement cages at Vasantara Skies
Basement retaining walls and column cages.
Ground-level columns rising with shuttering at Vasantara Skies, workers on site
Columns rising, shuttering on.

Phase 3

Slab steel and the first pours

Reinforcement laid across the full footprint and checked before the concrete goes in — the stage buyers rarely get to see.

Slab reinforcement laid across the full footprint at Vasantara Skies before casting
Slab reinforcement laid and checked before the pour.
Columns above the basement at Vasantara Skies seen from the road
Columns above basement level, from the road.

Phase 4

Basement complete, ground floor slab

The basement — the parking level — cast and clear, with its columns and beams in place. Above it, the ground floor slab shuttered and ready.

Inside the cast basement parking level at Vasantara Skies — columns and beams complete
Inside the basement: the parking level, cast and curing.
Front view of Vasantara Skies with the ground floor slab shuttered above the basement
From the road: ground floor slab shuttered.

Phase 5

Two floors up, masonry begins

Ground and first floor slabs cast, columns for the next floor rising, and block masonry under way on the lower levels — the building now reads as a building from the road.

Vasantara Skies with ground and first floor slabs cast and upper columns rising, seen from the road
Two slabs above ground, next columns rising.
Corner of Vasantara Skies with block masonry started on the lower floors
Corner detail: block masonry under way.

Phase 6 · current

Second floor slab — current stage

Steel laid for the second floor slab, then the pour. Slabs are now cast up to the second floor, the columns for the next floor are up with shuttering on, and masonry is well advanced below.

Reinforcement laid for the second floor slab at Vasantara Skies, neighbouring buildings behind
Reinforcement for the second floor slab before the pour.
Vasantara Skies with ground, first and second floor slabs cast and next columns rising, seen from the road
Three slabs above ground, next columns rising.
Angled view of Vasantara Skies showing shuttering for the next slab and masonry on the lower floors
Shuttering for the next slab; masonry filling in below.

How this relates to what you pay

The payment plan is construction-linked: each instalment falls due only after the stage it names — basement slab, plinth, each floor slab — has actually been built. The photographs on this page are the visible record of those stages going up.

Stage completion dates for payment purposes are certified by the project engineer and shared with every buyer with the demand notice. This page is a record of progress, not the demand notice.

See the site for yourself

Thirty minutes, no sales pressure. Walk the site, see the stage it is at, and decide at your own pace. Open every day, 10am to 7pm.

Book a Free Site Visit →

Common questions

What stage is construction at?

At the latest update (October 2026), slabs are cast up to the second floor and the columns for the next floor are rising, with block masonry under way on the lower floors. The photographs on this page show each stage in order.

How often is this page updated?

As each stage completes, with photographs taken on site. The current stage is always the last section.